Court Examines Whether AI Images May Receive Copyright Protection

Published on: November 6, 2023

Under the Copyright Act of 1976, copyright protection “subsists in any original work of authorship fixed in any tangible medium of expression, now know or later developed, from which they can be perceived or otherwise communicated, either directly or with the aid of a machine or device.”^ The Act goes on to state that works that may receive copyright protection are not limited to script or printed material but may include “any physical rendering of the fruits of creative intellectual or aesthetic labor.”^

Throughout its history, and despite the Act’s somewhat archaic language, copyright law has proven to be adaptable enough to cover all manner of works created with new and emerging technologies. However, the traditional understanding of copyright law is being challenged by the advent of artificial intelligence (AI) and its ability to produce new creations.

The US District Court for the District of Columbia. recently ruled that works created autonomously by AI are not susceptible of copyright protection. In Thaler v. Perlmutter, Stephen Thaler appealed an administrative decision by the United States Copyright office denying his application to register the copyright for an image generated by an AI program he developed. The court’s decision examined the meaning of what it means to be an “author,” as defined by the Copyright Act and held that only works of human authorship are susceptible of copyright protection under U.S. law.*

The court compared the issue to a case from 1884 that examined whether copyright protection could extend to the then-cutting edge field of photography. In Burrow-Giles Lithographic Co. v. Sarony, it was argued that a photograph should not qualify as a protected work because it was created by a camera. The US Supreme Court disagreed and held that while a camera may generate a “mechanical reproduction” of a scene, it does so only after the photographer develops a “mental conception” of the photograph^^. The court reasoned that the technology used to create the work was immaterial so long as there was human involvement in and creative control over the work.

In a later case, the US Ninth Circuit examined a case in which a crested macaque monkey took a photograph of himself, and various parties attempted to file suit on the monkey’s behalf to confirm copyright protection for the monkey’s photograph.** While the case was decided on standing grounds, the court considered whom the Copyright Act was designed to protect and concluded that the act was designed solely to protect humans.

The Thaler court identified no authority supporting copyright protection in any work originating from a non-human.* However, the issue presented in Thaler was limited to copyright protections for a work created solely by an AI, absent any human input. Therefore, it remains to be seen how courts will address issues related to copyright protection for images that blend human and AI origins.

We stand in a new frontier in both technology and copyright law. As artists and developers increasingly use AI as a tool, the increased distance between human creativity and the final product will present challenging questions regarding how much human input is necessary to afford these creations protection under copyright law.*

References:

^17 U.S.C § 102(a)

* Thaler v. Perlmutter, No. 22-CV-01564-BAH, R. Doc. 24 (Filed 08/18/23).

^^ Burrow-Giles Lithographic Co. v. Sarony, 111 U.S. 53, 59 (1884).

** Naruto v. Slater, 888 F.3d 418 (9th Cir. 2018).

Posted by:

Disclaimer

Keogh Cox & Wilson, Ltd. provides this blog as a public service for general information only. The materials contained herein may not reflect the most current legal developments or even express the opinion of all or even most of Keogh Cox attorneys. Such material does not constitute legal advice or form any attorney-client relationship. Keogh Cox and all contributing author(s) expressly disclaim all liability to any person with respect to the contents of this Web site and Blog and expect that no reliance will be made upon the information provided.

Continue Reading

Explore legal perspectives on the issues shaping Louisiana's key industries and courtrooms.

Insight

Risky Business : "Foreseeable" Damages in Commercial Transactions

Intuitively, contracting parties in commercial transactions understand that legal consequences follow a breach of contract: If a party fails to deliver a product as promised, the breaching party can be liable for the cost to correct the breach; but what is that cost?

Say, for example, a business cancels an order to provide parts to a long-time customer because the relationship has gone sour. Legally, the liability for that breach of contract may extend beyond the cost of the order. A breaching party is liable for damages that are a direct consequence of the failure to perform and that were foreseeable at the time the contract was made, which may include lost profit. If the breach was intentional or malicious, the party's liability may extend even to direct damages that were not foreseeable.

The business that cancelled the order now faces a jury’s decision to identify the direct and foreseeable losses, a decision that, by its nature, is vague. However, the law imposes a limit on the jury’s prerogative to decide the damages. Even for a bad faith breach of contract, liability arises only for the direct, immediate consequences of the breach and there should be no liability for damages determined to be remote, indirect, or that have no necessary relation to the breach.

In a recent case, a jury found that a defendant boat engine manufacturer breached its contract with plaintiff boat manufacturer by cancelling a purchase order for engines, and further, that the engine manufacturer was in bad faith. The jury awarded $1.8 million in foreseeable lost revenues and $1.3 million in unforeseeable lost profits. The trial court threw out the “unforeseen” portion of the award because it was not a direct damage, and emphasized that a breaching party does not “become the insurer for all misfortunes that may arise from the breach.”

The boat manufacturer had argued that the cash flow expected from the sale of the boats rendered engine-less by the breach would have been invested in more personnel and capital to grow its northwest division. But, because of depleted cash flow from lost sales, that opportunity was lost. The court found, as a matter of law, that this loss was not a direct consequence of the breach, and thus, regardless of the bad faith, was not a recoverable contract damage. Simply, loss of cash flow in one part of the business that had a ripple effect in a separate division was too indirect to be a recoverable damage. See Marine Power Holding, LLC v. Malibu Boats, LLC, 2016 WL 7241560 (E.D. La. 12/15/2016).

By contrast, courts have found that loss of cash flow is recoverable where directly related to the damages suffered, such as where breach of a contract to deliver chickens to a chicken farmer caused the forced sale of the chicken farm. See Volentine v. Raeford Farms of La., 50-698 (La.App. 2 Cir. 8/15/16), 201 So.3d 325.

Failure to perform on a contract exposes a business to more than it may realize. Understanding this risk allows for smarter decisions before the breach.

Insight

To Err is Human, To Rescind-Declined

The Louisiana Supreme Court recently addressed the impact of contractual "errors" in Cynthia Fry Perionnet and Elizabeth Fry Franklin v. Matador Resources Company, 2012-2292, 2012-2377, -- So. 3d --.

The Perionnet case involved a dispute over the intent of a contract to extend a mineral lease. The property owners believed that the lease was extended as to only 168.95 acres of nonproducing land. The defendant/lessors argued that the contract contemplated that the lease would extend to the entire 1850.34 acres to include producing wells. Plaintiffs/property owners argued that their unilateral error regarding the terms of the contract was ground for rescission. The jury ruled in favor of the defendant/lessors. The Court of Appeal reversed. The Supreme Court granted writs.

The Perionnet Court began its opinion with an overview of basic tenets of contract law. The Louisiana Civil Code defines a contract as "an agreement by two or more parties whereby obligations are created, modified, or extinguished." La. C.C. art. 1906. Contracts are formed through offer and acceptance. La. C.C. art. 1927. Once formed, contracts have "the effect of law for the parties and may be dissolved only through the consent of the parties or on grounds provided by law." La. C.C. art. 1983. One such "ground" under Louisiana law is "error." La. C.C. art. 1948.

The Louisiana Civil Code recognizes two forms of error: mutual error (both parties are mistaken) or unilateral error (only one party is mistaken). However, for either error to cause the dissolution of a contract, the error (1) must effect the cause of the obligation and (2) the other party must have known that the matter impacted by the error was the reason for the contract. La. C.C. art. 1949. In a case of mutual error, the court can reform the contract. Either partial or full rescission is the only remedy available for unilateral error. La. CC. art. 1952.

A party challenging a contract for unilateral error must also prove that the error was excusable. "Louisiana jurisprudence is sprinkled with cases which deny relief to the parties who claim an agreement should be invalidated because of unilateral error which is caused, in large part, by the complaining party's inexcusable ignorance, neglect or want of care." Id. p. 25.

The Perionnet Court found that the plaintiffs' alleged mistake was inexcusable. The defendants demonstrated that: 1) plaintiffs could show no excuse for failing to read and understand the contract; 2) plaintiffs' agents who negotiated and reviewed the contract were self-proclaimed experts in oil and gas; and 3) the original lease was on the plaintiffs' agent's own forms. The Court found a "sea of flags" in the written agreement that should have notified the experienced plaintiffs that the agreement extended to the entire property. Therefore, the Court found that the mistake was easily detectable and could have been rectified by a minimal amount of care, i.e. "by simply reading the document and/or requesting simple changes to the written offer before acceptance." Id. at 30.

The Supreme Court's Perionnet decision serves as a healthy reminder of a basic concept - read your contracts. Although to err may be human, it can affect your bottom line.

Insight

What's the Delay? Contractor Delay Damages Under the Public Bid Law

Generally, a provision in a construction contract for private work limiting the contractor's right to recover additional costs arising from delays outside of the contractor's control may be enforceable. However, under the Public Bid Law, such a provision has been found to be against public policy. La. R.S. 38:2216 prohibits any public contract provision that purports to waive, release or extinguish the rights of a contractor to recover delay damages if the delay was caused in whole or in part by the acts or omission of the public entity.

A recent First Circuit decision struck down a contract provision that purported to limit a contractor's right to damages in a public contract. In F.H. Myers Const. Corp. v. State, Div. of Admin. Office of Facility Planning & Control, 2013-2153 (La.App. 1 Cir. 6/18/14), reh'g denied (July 22, 2014), a general contractor brought an action against the State for breach of contract, seeking payments for extended-fixed job site overhead.

The State argued that the contract contemplated that the contractor could recover extended-fixed job site overhead only if there was a complete stoppage of work solely attributable to the State. The contractor argued that the contract provision was in violation of La. R.S. 38:2216.

The court found that La. R.S. 38:2216 contemplates that a contractor who is a party to a public contract shall be able to recover for any delay they may suffer from the fault of the State entity. Because the contract waived the contractor's rights to seek damages for extended-fixed job site overhead for any delay short of a complete stoppage of work, the contract imposed a stricter limit on damages than the statute allows. The court also noted that the contract only allowed for damages where the State was 100% at fault, whereas the statute allows recovery even if the State is only partially at fault. As such, the provisions at issue were held to be void and unenforceable.