Insight

Here Comes Hurricane Ida: What To Do If Your Home is Damaged by a Storm or Flood

Published on: August 28, 2021

Unfortunately, Louisianians have endured many natural disasters in the past several years. From the historic flooding in Baton Rouge in August 2016 to the devastation caused by Hurricanes Laura and Delta in 2020, Gulf Coast residents are very familiar with significant storms and flooding events. While the rebuilding process will take months or years to complete, this article is designed to provide some basic information on how to document and report your property damage claim and apply for and obtain disaster assistance.

  • DOCUMENT, DOCUMENT, DOCUMENT - Once you are able to do so, make sure to document the damages to your home and contents. Whether for a homeowners or flood insurance policy or to obtain government assistance, take plenty of photos of the damage. Make a list of the items in your home that were damaged or destroyed. One way to organize this list is to list each item from each room together, approximate its age, where it was purchased and its value when purchased. As you rebuild, and materials and items are thrown out, it will be much more difficult to document your claim.
  • REPORT YOUR CLAIM – Report your damage to your homeowners or flood insurer as soon as possible. Provide as much detail about the damage as you can. If you are unaware of your insurer, contact your insurance agent who can help you to report your claim.
  • OBTAIN MULTIPLE ESTIMATES - Although it is often difficult to do so after a natural disaster because of the volume of work, obtain multiple estimates for the work needed on your home. Pay for the estimate if necessary. If you have three estimates and the amounts are close, they are much more credible. Also, try and get as much detail as possible in each estimate, including specific materials to be used, dimensions, and finishes.
  • SAVE YOUR RECEIPTS – Whether for repairs you undertake to fix the damage to your home, to replace contents, or for living expenses after the storm, save your receipts. These receipts will be used to document your losses and verify the amount of your claim to your insurer.
  • FOLLOW UP WITH YOUR INSURER - Provide whatever is requested by your insurer as they adjust your claim. Communicate with your insurer on a regular basis. Although it may seem tedious, communication with your insurer during the claim is important.
  • APPLY FOR ASSISTANCE - Especially if your property is not insured, make sure to immediately apply for government assistance. You can apply for federal assistance at www.disasterassistance.gov. Oftentimes, the state government will also administer federal or state disaster assistance funds.

Posted by:

Disclaimer

Keogh Cox & Wilson, Ltd. provides this blog as a public service for general information only. The materials contained herein may not reflect the most current legal developments or even express the opinion of all or even most of Keogh Cox attorneys. Such material does not constitute legal advice or form any attorney-client relationship. Keogh Cox and all contributing author(s) expressly disclaim all liability to any person with respect to the contents of this Web site and Blog and expect that no reliance will be made upon the information provided.

Continue Reading

Explore legal perspectives on the issues shaping Louisiana's key industries and courtrooms.

Insight

When It Comes to Real Estate, Get It In Writing

As the old adage goes, it’s always safest to get an agreement in writing. In Louisiana, when an agreement is about the sale of real estate, the adage is law. A contract for sale must be in writing as provided in Louisiana Civil Code articles 1839 and 2440.

This long-standing rule was at issue in the recent case of Holmes v. Paul, 19-130 (La. App. 5 Cir. 10/2/19), 279 So. 3d 1068. In Holmes, the plaintiff/seller and defendants/purchasers entered into a purchase agreement for a Metairie home which required a closing by no later than April 29, 2016. The contract was a standard form Louisiana purchase agreement which required that any change in the closing deadline be written and signed by both parties. The parties later entered a written extension of the closing deadline to May 6, 2016.

Three days before the closing, the home appraised for $14,000 below the purchase price, leading the seller’s agent to encourage the purchasers’ agent to pursue an appraisal review. However, the parties did not sign a written extension of the May 6, 2016 closing deadline. Thereafter, the seller agreed to decrease the purchase price to the appraised value, but on the same day the purchasers sent a signed cancellation. The seller sued the purchasers for breach of contract, arguing that the parties verbally agreed to extend the closing deadline and intended to execute a written extension as soon as they determined a feasible closing date.

The purchasers moved for summary judgment on the ground that the purchase agreement had expired and was unenforceable. The Court agreed. The purchase agreement expressly required that extensions be made in writing signed by both parties. Upon the expiration of the May 6, 2016 closing deadline, the contract was unenforceable.

The seller also asserted a detrimental reliance claim, arguing she was lulled into not insisting on a written extension because the purchasers’ agent agreed to it orally. However, the seller conceded her awareness that an extension had to be in writing. As such, her reliance was not reasonable. The court further noted the absence of evidence that the purchasers themselves agreed to orally extend the contract or to waive the writing requirement.

Unfortunately, business deals in the modern world cannot be finalized by a handshake. Remember that when you buy and sell property in Louisiana -- get it in writing.

Marty Golden has been practicing law based in Baton Rouge, Louisiana for over thirty years, concentrating in civil litigation primarily involving injuries, property damage, insurance coverage, and contract disputes. Much of his practice is defending and advising real estate agents in suits by property buyers and sellers, but Marty also defends other professionals, insurance companies, manufacturers, and business owners. Marty has a special interest in all things procedural, because they are the rules of the road for litigators and knowing them better than his opponent gives him a leg up in court.

Insight

Click It: The Seat Belt Defense In Louisiana

Louisiana has exhibited a certain double standard when it comes to seat belts. For years, Louisiana participated in the “Click It or Ticket” public service campaign that lectured on the grave dangers caused by a failure to wear seat belts and the criminal consequences for a failure to comply. Nevertheless, and for decades, the failure to wear a seat belt was off limits as evidence to reduce a plaintiff’s recovery in a personal injury context. But, the rule was changed: effective January 1, 2021, the “gag rule” against evidence that a plaintiff failed to wear a seat belt in an accident has been lifted. La. R.S. 32:295.1. Louisiana has no recent history with the “seat belt defense,” such that many questions arise. To frame these questions, this blog takes a quick look to cases from other states and certain guideposts that may already exist in Louisiana jurisprudence.

Like several other states, Florida has a history with the defense. In Smith v. Butterick, 769 So.2d 1056, 1058-9 (Fla.2d DCA 2000), the court outlined three elements of proof a defendant must show to prevail on the defense. Similar elements have been identified in other states. See, e.g., Law v. Superior Court In and For Maricopa County, 157 Ariz. 147, 755 P.2d 1135 (1988). Louisiana may adopt similar elements or chart a different course. The elements outlined in Smith were as follows:

1-Failure to use an available, operational seat belt

This element can be proven through testimony from the plaintiff, passengers, responding law enforcement, or other such testimony or evidence to show that a seat belt was not in use at the time of the accident. Similarly, testimony or photographs may be used to show that the seat belt was operational.

2- Failure to use seat belt was unreasonable under the circumstances

Insofar as Louisiana and most states generally mandate the use of seatbelts, this element should be easy to demonstrate. Therefore, unusual facts may be necessary to excuse a plaintiff’s failure to use a seat belt such as an emergency trip to the hospital.

3-Plaintiff’s failure to use a seat belt substantially caused or contributed to the damages

Of the three possible elements, this is likely to be the battleground. In some cases, the issue may be simple. For instance, if a plaintiff’s failure to use a seatbelt allows their body to strike (or travel through) a windshield, it may be simple to show that the plaintiff’s (or decedent’s) failure to use a seatbelt magnified the injuries. Expert testimony may not even be needed. In Smith, testimony from a mechanical engineer that the passenger would not have hit interior surfaces had they used a seat belt was allowed. However, will expert testimony be required in most cases and what type of expert will be needed? Engineer? Physician? Biomechanical?

Will the defendant bear the burden to prove the aggravation like they have in many national cases? Will Louisiana courts fashion an inference or “shifting burden” approach where a prima facie showing that a plaintiff’s whose failure to wear a seat belt increased the possibility of injury would possess the burden to show their injuries would have occurred even had they used a seat belt. In Anderson v. Watson, 953 P. 2d 1284 (Colo. 1998), the court required the defendant to only show a prima facie case of seat belt nonuse to allow the fact of nonuse to go to the jury.

Seat belts are required because they can prevent or lessen injury. Does a defendant have to show the precise details as to how seat belt nonuse caused or magnified the injury? In Louisiana, these answers remain unclear; but these are some of the questions.

Further complications are present in cases involving alleged traumatic brain injury (TBI) and the new frontier of vestibular injuries. Louisiana courts have often rejected testimony from accident reconstruction or bio-mechanical experts for a variety of reasons, but with this statutory defense, such testimony may be critical to determine who is responsible for an alleged catastrophic loss. States that recognize this rule have examined many factors that relate to the injuries that arise from the failure to use a seatbelt. As such, it seems inevitable that expert testimony on this issue must be considered in many nonuse cases.

No doubt, many of these questions will be the subject of litigation arising from accidents which occur after January 1, 2021. Louisiana’s double standard has ended. What is certain is that a failure to wear a seat belt now has the potential to harm not only a plaintiff’s health, but also their chances of recovery in civil litigation.

Collin is a Keogh Cox partner who litigates injury, commercial, and legal malpractice disputes. He lives in nearby Zachary, Louisiana with his wife Melissa and three all too active children. He is an outdoorsman, a tennis player, a cook, and a hobbyist writer.

This blog was written in partnership with John P Wolff, III.

.

Insight

A Matter of Control: Vicarious Liability in Construction Projects

Under Louisiana’s comparative fault system, each party in a lawsuit generally is only liable for their own percentage of fault. However, in some instances, a party may be “vicariously” liable for the fault of another party. One example of vicarious liability is an employment relationship, where an employer can be liable for the fault of its employees. On the other hand, vicarious liability generally does not apply when the alleged “employee” is found to be an independent contractor. Whether a worker qualifies as an employee or an independent contractor often becomes an important issue in suits related to construction projects.

The test for determining whether a party is an employee or an independent contractor involves analysis of who has the right to control his or her work. In the construction context, courts distinguish between “operational control” (which suggests an employment relationship) and control as it relates to the results of the work (which suggests an independent contractor relationship). Two recent cases examine this issue and provide examples of how courts analyze the type of control necessary to establish vicarious liability in the construction projects.

In Stonetrust Com. Ins. Co. v. TBT Contracting, Inc. of LA, homeowners hired a general contractor to renovate their home. During the project, an electrical subcontractor was injured after falling through an attic space. It was alleged that the general contractor created a hazard by cutting a hole in the attic and concealing it. The plaintiff sued the general contractor and the homeowner. The court had to determine whether the homeowner could be liable for the subcontractor’s injuries, which would require a finding that the homeowner was vicariously liable for the general contractor’s fault.

The plaintiff argued that the homeowners were particularly involved in the project. It presented evidence to show the homeowners would give suggestions regarding the work to be performed and also directed alterations or additions to the work. The plaintiff argued that this demonstrated control over the general contractor’s work. However, the court disagreed. Despite the homeowners’ level of involvement, the court held that their control was limited to the results of the work, and was not “operational control.” The general contractor therefore was an independent contractor, and the homeowners were not vicariously liable for its acts.

In Baham v. Fisk Elec. Co., a city worker brought suit against a general contractor after suffering injuries from an electrical shock. The worker alleged that the general contractor was vicariously liable for the fault of its subcontractor. While evidence showed the subcontractor relied on the general contractor for the location of its work, the court found that this was not “operational control.” The court observed that general contractors are entitled to exercise supervisory control over its independent contractors to ensure compliance with the contract. It further found that suggestions or instructions given to an independent contractor do not equate to control over the methods or details of the work. Absent such “operational control” vicarious liability could not be imposed.

Though they may be limited to their facts, these cases show courts usually require a showing of more than suggestions or instructions regarding the work to establish the “operational control” necessary to trigger vicarious liability. Absent such a showing, independent contractors usually remain independent.

Case References:

Stonetrust Com. Ins. Co. v. TBT Contracting, Inc. of LA, 2022-0971 (La. App. 1 Cir. 4/14/23), 2023 WL 2947826

Baham v. Fisk Elec. Co., 2022-0551 (La. App. 4 Cir. 3/22/23), 2023 WL 2595253

Christopher K. Jones

Partner
Flood
Louisiana
Hurricane
Insurance