Insight

What is a Design Professional’s Tort Duty?

Published on: May 24, 2024

A design professional’s duties and responsibilities on a construction project generally are outlined in its contract with the owner. Does a design professional’s duty extend to third parties? The Supreme Court recently addressed this issue and held that the design professional’s duty to third parties is limited to the terms of the contract documents.

In Bonilla, a construction worker was injured while performing demolition work on a construction project. The worker, who was a subcontractor on the project, filed suit against the architect and the engineer on the project alleging that these design professionals failed to monitor and supervise the execution of the plans to ensure safety on the job site.

The engineer and the architect filed summary judgment motions arguing that they owed no duty to oversee, supervise, or maintain the construction site. The trial court granted their motions. However, the appellate court found the contract between the architect and the owner may have inferred a duty was owed to the worker.

The appellate court referenced contract provisions that required the architect to make weekly site visits and to report to the owner any deviations from the plans. The court noted that the architect was on site the day of the accident and photographed potential unsafe conditions, which would have deviated from the plans. The appeal court reversed the trial court’s ruling granting summary judgment.

The architect filed a writ with the Louisiana Supreme Court, which reversed the appellate court’s ruling and reinstated summary judgment in favor of the design professionals. The Supreme Court emphasized “the duty owed to an employee of a contractor by an engineer or architect is determined by the express provisions of the contract between the parties.”

While the contract documents required the architect to make weekly visits to the jobsite, the purpose of this duty was to ensure that the owner received the building it paid for and that the progress and quality of the work met the plans. More importantly, the contract also provided that these site visits did not create a duty to supervise construction. In contrast, under the terms of the contract, the contractor had control over construction means and methods and responsibility for site safety, specifically including site safety for all employees.

The clear and unambiguous language of the contract dictated that the design professions owed the worker no duty. Therefore, the Supreme Court held that the architect could not be held liable for failing to perform a duty that it had no responsibility to undertake.

Reference:

Bonilla v. Verges Rome Architects, 2023-00928 (La. 3/22/24), 382 So. 3d 62.

Posted by:

Disclaimer

Keogh Cox & Wilson, Ltd. provides this blog as a public service for general information only. The materials contained herein may not reflect the most current legal developments or even express the opinion of all or even most of Keogh Cox attorneys. Such material does not constitute legal advice or form any attorney-client relationship. Keogh Cox and all contributing author(s) expressly disclaim all liability to any person with respect to the contents of this Web site and Blog and expect that no reliance will be made upon the information provided.

Continue Reading

Explore legal perspectives on the issues shaping Louisiana's key industries and courtrooms.

Insight

Going Once, Going Twice ... A New Alternative to Design-Bid-Build Contracts

The 2014 Legislative Session brought new possibilities for large construction projects under the Public Contract Law. Generally, a public entity is required to separately hire a design professional to design the project, and let the project out for public bid for the construction work. "Design-build" contracts, in which the public owner contracts with one entity for the design and construction of the facility, are prohibited under Public Contract Law. However, the Legislature has now given public entities another option under the Public Bid Law: Construction Management at Risk Delivery Method (CMAR).

As a precursor to the new law, the Legislature granted special approval for use of the construction management at risk delivery method for several projects, to include the new airport terminal for the New Orleans Aviation Board at the Armstrong International Airport. This CMAR delivery method required two separate contracts for design and construction, but allowed selection of the construction contractor based on factors other than lowest construction cost. In other words, the design professional was selected in accordance with Public Contract Law, and the owner secured a lead construction firm during the design phase through an evaluation of the contender construction firms' qualifications, experience and history.

Under a construction management at risk delivery method, the selected lead contracting firm commits to deliver the final project for a maximum price. The owner has the option to award the construction contract to the firm after the design phase. Because the design professionals and the contractor are on the same team during the design phase, many industry leaders believe the construction management at risk method will help public entities control costs by allowing the contractor and designer to work together on scheduling, budgeting and constructability during the design phase. The goal also is to minimize the risk of construction and design disputes through the collaborative effort.

In 2014, via Act 782, the Legislature enacted La. R.S. 2225.2.4 which allows a public entity to use the CMAR method for projects estimated to cost 25 million dollars or more. The statute defines a CMAR contractor as one who is properly licensed, bonded and insured and can provide construction experience to the owner or its design professional and/or contracts with the owner to construct the project for a guaranteed maximum price, thus eliminating the need for a separate bid phase.

Under the statute, the public entity must advertise a request for qualifications to award a contract to a CMAR contractor for preconstruction and construction services in the official journal and website of the public entity. After the responses to the RFQ are received, a selection review committee makes a recommendation to the owner. This committee consists of one design professional not involved in the contract, one licensed contractor not involved in the contract, a representative of the owner and two members from the general public.

Once the CMAR contractor is awarded the contract, the contractor and the design professional are required to furnish the owner with a probable cost of the project at the 60% and 90% design completion phases. The CMAR contractor must provide the public entity a guaranteed maximum price for construction of the project. If the owner agrees with the guaranteed maximum price and the construction phasing and sequencing, the owner can award the construction contract to the CMAR contractor. If the public entity and the CMAR contractor cannot agree, the construction phase of the project will be re-advertised and let out for public bid.

Insight

Pass-Through Claims and Prescription

In Couvillion Group, LLC v. Plaquemine Parish Government, the Louisiana Court of Appeals for the Fourth Circuit addressed whether the general contractor could recover “pass-through claims” against the owner where those claims would be time-barred if brought directly by the subcontractors. “Pass-through claims” have been described as damage claims that subcontractors “pass through” to the contractor to prosecute an action against the project owner to recover those damages.

In Couvillion, the contractor sued the Parish for delay damages. The trial court awarded $2,782,724 in delay damages, $300,000 of which was for delays incurred by two of the subcontractors.

On appeal, the Parish argued that the contractor could not recover the pass-through claims because any claims for delay that the subcontractors had against the contractor were prescribed (time-barred). The subcontractors sent demand letters after substantial completion in 2013 but did not file suit against the contractor. Under Louisiana law, contract claims are subject to a 10-year prescriptive period. The Parish asserted that by the time trial occurred in 2024, the subcontractor claims had prescribed.

The Fourth Circuit recognized that subcontractors often pass their claims through the contractor to prosecute against the owner to recover those damages. The contractor included those claims in the lawsuit filed against the owner in 2015. When several parties share a cause of action, suit by one party interrupts prescription as to all parties. As such, the court held that prescription was interrupted, and the contractor could recover the pass-through claims against the owner.

This case highlights the importance of identifying and properly preserving pass-through claims early in litigation.

References:

Couvillion Grp., LLC v. Plaquemines Par. Gov't, 2025-0356 (La. App. 4 Cir. 1/7/26), 430 So. 3d 1175, writ denied, 2026-00217 (La. 5/12/26), 430 So. 3d 1090.

Insight

Who’s Left Holding the Bag? Indemnity in Construction Contracts

The period of time before the contract is signed in one of optimism. After all, few sign a contract expecting problems. But if you do not consider the many "what ifs," you may be left holding the bag. And this "bag" may include indemnity provisions which could force you respond for the actions of other parties.

Many contracts include "indemnity" or "hold harmless" provisions. Black's Law Dictionary defines indemnity as "a duty to make good any loss, damage, or liability incurred by another." Like many states, Louisiana allows one party to agree to pay for the damages caused by the fault of the other, if this intention is sufficiently expressed. However, there are broad statutory exceptions that can nullify the indemnity requirement.

Parties to construction contracts should be careful not to blindly rely upon indemnity provisions because the Louisiana legislature in La. R.S. 9:2780.1 declared invalid any indemnity provision where a party seeks indemnity from another for its own fault.

Despite the broad nullification of certain types of indemnity provisions in construction contracts, current Louisiana law allows a party to be indemnified for its own fault when the other party obtains insurance to cover the risk, and recovered the cost of insurance in the contract price. For example, a general contractor can require a subcontractor to indemnify the general contractor for the general contractor’s fault, as long as the subcontractor obtains insurance for this obligation, and was paid that amount under the contract.

Indemnity obligations are not always as they seem. Even in the pre-contract period of optimism, you may want to contact an attorney so you won't be left holding the bag.

Chelsea Payne is an associate at Keogh Cox and has been practicing for three years. Her practice mainly relates to construction law and complex litigation. Chelsea enjoys playing tennis and spending time with her family.