Fourth Circuit Brings Clarity to Peremption Statute in Suit Against Design Professional

Published on: February 15, 2016

The question addressed in MR Pittman Group, LLC versus Plaquemines Parish Government, 2015-0396 (La.App. 4 Cir. 12/2/15) was whether the five-year peremptive period set by La. R.S. 9:5607 displaces Louisiana’s general one-year prescriptive period set by La. C.C. art. 3492, when applied to tort claims against design professionals. Finding a contractor’s claim against the project engineers prescribed, the MR Pittman court held that the one-year prescriptive period governs tort claims against design professionals.

La. R.S. 9:5607 explicitly provides a peremptive period that extinguishes all claims against architects, engineers and other design professionals five years after the project is completed, thus limiting design professional liability associated with the project. The MR Pittman plaintiff/contractor argued that the statute also eliminates the one-year prescriptive period and instead creates a special five-year prescriptive period, which allowed the contractor up to five years to bring its claim against the engineers to recover for delay and other extra costs allegedly resulting from deficiencies in the construction plans. This interpretation effectively expands tort liability by increasing the time period for bringing a tort claim from one to five years. In rejecting this argument, the MR Pittman court clarified that under the statute any claimant has no more than five years after project completion to bring suit against the design professional for any cause. However, a tort claimant still has only one year to file suit from the date he “knew or should have known” of damage caused by the alleged wrongful actions of the design professional.

A secondary question addressed in MR Pittman was the date of commencement of the one-year prescriptive period, which under La. C.C. 3492 commences to run from the day damage is sustained. The defendant/engineers argued that prescription commenced when the contractor first became aware of the alleged design deficiencies early in construction, as evidenced by the contractor’s notice to the owner of the deficiencies. The contractor argued that it could not fully appreciate its damages until the change orders were resolved later in the project. Citing Louisiana Supreme Court precedent holding that the quantum of damages need not be certain or fully incurred to trigger commencement of prescription, Harvey v. Dixie Graphics, Inc., 593 So.2d 351, 354 (La. 1992), the court agreed with the engineers’ position and dismissed the claims.

Posted by:

Disclaimer

Keogh Cox & Wilson, Ltd. provides this blog as a public service for general information only. The materials contained herein may not reflect the most current legal developments or even express the opinion of all or even most of Keogh Cox attorneys. Such material does not constitute legal advice or form any attorney-client relationship. Keogh Cox and all contributing author(s) expressly disclaim all liability to any person with respect to the contents of this Web site and Blog and expect that no reliance will be made upon the information provided.

Continue Reading

Explore legal perspectives on the issues shaping Louisiana's key industries and courtrooms.

Insight

Interrupted by Silence: Medical Malpractice Prescription

By C. Reynolds LeBlanc

La. R.S. 9:5628 provides that a patient/medical malpractice plaintiff must assert his or her claim within one year of the alleged negligent act or from when that act is discovered. If a claim is not raised within this time frame, it is “prescribed,” i.e., untimely. The statute also declares that all claims must be asserted within three years of the alleged negligent act, even if the patient was unaware of the malpractice. However, there are exceptions.

Under the doctrine of contra non valentem,prescription does not run if the defendant has done something to prevent theplaintiff from filing within the prescriptive period. In In re MedicalReview Panel of Gerard Lindquist, 18-444 (La. App. 5 Cir. 5/23/19), 274So.3d 750, the Louisiana Fifth Circuit considered whether a decision not totell a patient about malpractice exempted from prescription a claim which wasnot filed within three years of the alleged malpractice.

In the case, Lindquist had spinal surgery on August 22,2013. He returned on August 24, 2013 with complaints of pain. Although an x-rayshowed a metal artifact in the operative site of his back, he was not informedand was discharged. He returned the next day with continued complaints of painand an MRI was ordered. Like the x-ray, the MRI showed the metal artifact.Again, the plaintiff was not informed.

Lindquist continued to experience pain for years. When another MRI was performed on May 25, 2017, Lindquist was first informed of the metal object in his back. Within months, he filed a claim against the doctor who performed the 2013 surgery. In response, the doctor argued that the claim was prescribed under La. R.S. 9:5628 because it was filed more than three years after the surgery.

Contra non valentem applies where a plaintiff has been lulled into inaction because of concealment or fraudulent conduct by the defendant. The doctor argued that this standard was not met simply because the doctor was silent about the patient’s condition. However, the Lindquist court held that a doctor possesses an affirmative duty to advise a patient of pertinent medical information such as the presence of a metal artifact near the spine. Therefore, if the doctor, as alleged in Lindquist, failed to disclose a metal foreign object, this would constitute a fraudulent act which prevented the plaintiff from filing his claim timely. In Lindquist, prescription was interrupted by silence and the plaintiff/patient was allowed to pursue his claim.

Reynolds LeBlanc is a partner at Keogh Cox. His practice areas include commercial litigation, personal injury claims, appeals, and other matters. Reynolds is a former teacher, who in his free time plays music and perpetually talks himself into training for his next marathon.

News

A Jury Awards $5 Million In Favor of Spoked Manufacturing

A Louisiana federal jury awarded $5 million in favor of Spoked Manufacturing in a suit against Besco Tubular. Keogh Cox Partner, Tori S. Bowling and other counsel represented Spoked Manufacturing in the case. Find out more about this decision at LAW 360.

https://www.law360.com/articles/1180212/jury-hits-besco-with-5m-verdict-in-oil-drilling-patent-case

Insight

A Matter of Control: Vicarious Liability in Construction Projects

Under Louisiana’s comparative fault system, each party in a lawsuit generally is only liable for their own percentage of fault. However, in some instances, a party may be “vicariously” liable for the fault of another party. One example of vicarious liability is an employment relationship, where an employer can be liable for the fault of its employees. On the other hand, vicarious liability generally does not apply when the alleged “employee” is found to be an independent contractor. Whether a worker qualifies as an employee or an independent contractor often becomes an important issue in suits related to construction projects.

The test for determining whether a party is an employee or an independent contractor involves analysis of who has the right to control his or her work. In the construction context, courts distinguish between “operational control” (which suggests an employment relationship) and control as it relates to the results of the work (which suggests an independent contractor relationship). Two recent cases examine this issue and provide examples of how courts analyze the type of control necessary to establish vicarious liability in the construction projects.

In Stonetrust Com. Ins. Co. v. TBT Contracting, Inc. of LA, homeowners hired a general contractor to renovate their home. During the project, an electrical subcontractor was injured after falling through an attic space. It was alleged that the general contractor created a hazard by cutting a hole in the attic and concealing it. The plaintiff sued the general contractor and the homeowner. The court had to determine whether the homeowner could be liable for the subcontractor’s injuries, which would require a finding that the homeowner was vicariously liable for the general contractor’s fault.

The plaintiff argued that the homeowners were particularly involved in the project. It presented evidence to show the homeowners would give suggestions regarding the work to be performed and also directed alterations or additions to the work. The plaintiff argued that this demonstrated control over the general contractor’s work. However, the court disagreed. Despite the homeowners’ level of involvement, the court held that their control was limited to the results of the work, and was not “operational control.” The general contractor therefore was an independent contractor, and the homeowners were not vicariously liable for its acts.

In Baham v. Fisk Elec. Co., a city worker brought suit against a general contractor after suffering injuries from an electrical shock. The worker alleged that the general contractor was vicariously liable for the fault of its subcontractor. While evidence showed the subcontractor relied on the general contractor for the location of its work, the court found that this was not “operational control.” The court observed that general contractors are entitled to exercise supervisory control over its independent contractors to ensure compliance with the contract. It further found that suggestions or instructions given to an independent contractor do not equate to control over the methods or details of the work. Absent such “operational control” vicarious liability could not be imposed.

Though they may be limited to their facts, these cases show courts usually require a showing of more than suggestions or instructions regarding the work to establish the “operational control” necessary to trigger vicarious liability. Absent such a showing, independent contractors usually remain independent.

Case References:

Stonetrust Com. Ins. Co. v. TBT Contracting, Inc. of LA, 2022-0971 (La. App. 1 Cir. 4/14/23), 2023 WL 2947826

Baham v. Fisk Elec. Co., 2022-0551 (La. App. 4 Cir. 3/22/23), 2023 WL 2595253

No items found.
Architects
Construction
Contractors
Engineers
Peremption
Prescription
Professional Liability